![](https://www.syn-group.com/wp-content/uploads/2019/07/health_care_querformat.jpg)
Case Study
Having previously delivered several successful improvement projects for our client, we were asked by the CEO to improve the performance of this US-based site, which was experiencing significant performance issues.
A variety of issues including low machine effectiveness (OEE), poor productivity and a high level of waste were causing excessively high manufacturing costs. In addition, operator capability was low due to a historical lack of investment in training.
Our objectives were very clear: